This building had already made the change over to Low Energy lighting as well as partial change over to an all-electric heat source with VRF.
Our audit identified opportunities to reduce further the reliance on gas for heating and hot water through the future works of installing multiple Air Source Heat Pumps.
The RDFC Sports Centre located within the original site of the Rushden & Diamond Football Cub stadium, jointly houses a fitting appointed athletics and gymnastic facility as well as a base for Citrus Group training offices.
The Citrus Group aware of pending Minimum Energy Efficiency Standards (MEES) required a full energy use audit and performance to avoid the building becoming a stranded asset.
We conducted a potential pre-demolition audit of stadium and ancillary buildings to enable future development works. This identified a 90% avoidance of Landfill through organised waste stream management to re-use, repurpose and recycle.
The revised EPC works based upon the installation and future works forecast a overall carbon saving of 124 tonnes of Carbon per year, returning to a MEES compliant C rated building.
Client |
Citrus Group |
|
Time frame |
50 weeks |
|
Carbon savings |
124 tonnes |